Monday, September 19, 2011

How to install rubber roofs (3)?

7 cut the role of tar autour. Insert a piece of tar and cover the upper part of the socket base double coverage, to avoid water penetration. Secure with Staples.

8 Install the starter, which is simply an entry in the first visible line of rubber tiles. The track will prevent water present discrepancies between the tiles and the recess between the cards.

9 Install rubber slats in the lower right corner of the work on the sides and then move upwards.

10 Arrange tiles to be directly above the ends and not shingle tab indents gaps below. Align water filtration through vulnerability avoids in the ditch, which can be captured in the isolation of the roof and then make their way through the holes of the nail.

11 Cut shingles rubber gradually from the first Bank of rocks in each row. A mismatch will cause gaps, better protection of the waters of the ceiling should be a cut Off line, followed by a second line with 6 inch and then cut, followed by cuts of 12 inches, and so on.

Nail every rock premium roof with a nail gun rubber tyres. Place the first full pebbles on the edge of the slope of 1/8 of an inch. In this way, it would be a distance of vertical panel on the roof, thus helping to reduce the degradation of the water. Continue on drilling wells, each rubber Pebble, starting with the Horn, the Labour Party, then to the Summit.

1 comment:

  1. It's my pleasure to see your blog here the idea you share is more useful for me. Thanks for sharing.

    Iko roofing shingles

    ReplyDelete